St Johns Wood Estate, Gordon

Client: Cambridge Building Management Services

A private complex of 48 townhouses located in Gordon backing on to bushland was fully replaced by us back in 2019. We proposed a highly detailed project management plan and schedule of works along with a competitive tender which resulted in us being awarded this contract .

Located so closely to the bushland meant that all of the decks had to be replaced in accordance with Flame Zone requirements, which entailed full steel frames with hardiedeck cement based deck boards with semi frameless glass balustrades and galvanised steel staircases.

The original decks were all built in timber back in the 1990s so were no longer compliant and were severely dilapidated. The project took over 3 months to complete we had 6 crews of 3 carpenters per team all working on 6 decks in a row and we  and went from one set of 6 to the next, this not only enabled us to carry out the project swiftly but it also ensured that the home owners were without the use of their decks for the shortest possible amount of time which was very important as this was carried out in the middle of summer

Over 1000m2 of decking boards and 700 metres of balustrade and 48 sets of steel staircases were installed during the build process and a full detailed inspection clean up and walk through with the building management company was carried out at the end of the project to ensure that everything was to their satisfaction.